Client / client: Bau- und Liegenschaftsbetrieb NRW, Duisburg Realization: 2006 Procedure: Competitors.
Urban improvement: The new developing complements the historical monastery ensemble and therefore clearly relates towards the listed context. The design and style has the cour d? Honneur in its geometry by completing the edge of the square provided by the administration wing and continuing it as a room delimitation inside. The courtyard is thus the guiding principle for the developing design and style with no restricting the independent architectural and style language. In the very same time, the alignment of the building edges on the courtyard level enables the view to the adjoining open space between the auditorium along with the cafeteria. By layering the structure, the style reacts to the urban limits on the monastery paraphrase online tool complicated, orientates the library towards the residence and thus clearly assigns the new building to the historical ensemble. The value in the library is emphasized by the cantilevered upper floor. The generous glazing from the reading room, the “window to the courtyard”, corresponds with the other buildings. A gate situation is developed between the library plus the administration wing, which leads in the square in front with the cafeteria towards the cour d? Honneur. The new developing closes the edge of the courtyard to Klemensborn along with the space in front on the cafeteria is specified.
Developing idea: The building is entered from the cour d? Honneur and is divided into three floors. The courtyard along with the upper floor kind the developing that is definitely perceptible from the cour d? Honneur. Right here, intermediate http://bulletin.temple.edu/undergraduate/academic-policies/non-degree-seeking-students/ levels and galleries are inserted in sub-areas, which divide the volume with the main floors into zones of diverse spatial effects and high-quality of knowledge. The overlapping geometries of the ceilings generate fascinating visual relationships. University and library use are accessed separately and may thus be operated independently of 1 another: The seminar rooms around the basement floor as well as the professors’ offices around the gallery level of the courtyard floor are connected by way of a separate staircase. Access to the library with reception, distribution counter and media area is around the courtyard level. Further central functions are arranged there on a gallery and are connected via the spacious staircase.
Material: The facade in the library is intended as a directional cladding produced of metal. Extra elements like the street-side wall on the basement plus the frame of your constructing access are planned in all-natural stone. Subordinate area closures are created of glass of diverse transparency. Set bodies for instance the elevator as well as the archive are highlighted by contrasting wood coverings.
Outside facilities: The cour d? Honneur square is going to be restored to its original size. The historical paving is going to be supplemented plus the topography of the developing access will be adapted towards the requirements. In contrast, the adjacent open space involving the auditorium along with the cafeteria is greened. Within this way, the differentiated identities from the distinctive courtyard locations on the monastery are worked out and strengthened. The wall adjacent towards the gate building will be closed, thereby strengthening the importance on the gate /reword-my-essay-in-uk/ creating.
WBW new constructing library Folkwang Monday, September 25, 2006 Dorothee Egger.